Key Words: Magnet wire supplier, Winding wire supplier,Electromagnetic wire,Winding Wire, Enameled Wire, Copper wire
SERVICE PHONE
+86 18773288963
News
SERVICE PHONE
0731-58590698

SERVICE PHONE

0731-58590698
Gold Cup Electric Electromagnetic wire Co., Ltd.
Tel: +86 18773288963
Fax: 0086 731 58591001 Email: portia.chen@gold-cup.cn Website: www.goldcupwindingwire.com
Add

News

Current Location:Home-News

Gold Cup Electric's "High-end Special Electromagnetic Wire R&D Project Team"

Release Time:2020/7/9 15:38:20

Revitalizing Enterprises and the Nation through Scientific Research

——Gold Cup Electric's "High-end Special Electromagnetic Wire R&D Project Team"

UHV ultra-long-distance power transmission and transformation project--one of China's national image business cards, the important basic construction content of the implementation of the "Belt and Road" strategy...

The new type of military equipment’s push motor, the land and sea electromagnetic device, and the electromagnetic weapon equipment, which represent the most advanced level of the latest generation of combat and support equipment of the army...

"Hualong One"-the representative of the third generation of nuclear power technology, the mainstream product of my country's civil nuclear power assembly equipment; the latest generation of ultra-high temperature nuclear power motors, one of the landmark projects that effectively broke through the international technical blockade and demonstrated the national revitalization force...

The core key component of HEV/EV--motor, leads the iterative upgrade of new energy industry technology, makes full use of the absolute advantage of Gold Cup Electric's copper flat wire, cultivates new economic growth and profit, and promotes the spirit of second entrepreneurship, pushes enterprises to achieve transformation and upgrade...

All of the above are worthy to be proud. And all of these that inspire the nation has Gold Cup Electric contribution. There is a young, capable and highly innovative research team in Gold Cup Electric. It is Gold Cup Electric's "high-end special electromagnetic wire R&D project team".



This is a youthful, capable and special team.

The average age of this team is only 35.05 years old, members under 35 years old account for about 70%, members over 5 years of working age account for 92%, undergraduate degree and above account for 67%; they are capable workers come from different departments.They are the absolute main force and experts of the company's scientific research, technological transformation, production and sales. This team is the company's pioneering and implementation of excellent performance. The team members are directly managed by the project leader, breaking the department wall and the original organizational structure, achieving cross-department barrier-free cooperation, meeting the needs of new technology, new product development and trial production, and maximizing the project team effectiveness.




This is a team that dares to take responsibility.

The team's main development products include special electromagnetic wires such as electromagnetic wires for EV/HEV, special high-voltage transmission and transformation, new-generation nuclear power motors. The electromagnetic wire project for EV/HEV mainly develops small flat wires replacing traditional enameled round wires. In order to solve the problem of reduced reliability of insulation performance, complicated processing problems, and increased processing accuracy. Deputy team leader Zhao Fengjing insisted on fighting on the front line of technology during pregnancy. She returned to work before the maternity leave was over to engage in technical research. The electromagnetic wire project for UHV transmission and transformation equipment has very high requirements on the insulation reliability. The team leader often leads the members to work overtime and try new materials. On-site special analysis meetings are held. The members who live in Changsha choose to live in the dormitory instead of going home. They finally solved the high-tech problems of insulation reliability, conductor size accuracy, high-temperature bonding performance, transposed conductor structure, etc.




This is a team that dares to fight hard and wins.

From scratch, from tradition to breakthrough, this is the "pain" experienced by people who engage in technological innovation all the time, not to mention the research and trial production of leading technological processes and products. At the beginning of the research and development of new nuclear power projects, the technical status and product performance parameter requirements of international monopoly companies once made our young team "be laughed at by (the) experts". The national highest temperature resistance grade winding wire is exclusively developed and supplied by us. The required temperature resistance level of the project is twice as strong as that of traditional products. Without qualified materials and insulation structures, it is almost impossible to achieve. The special consultant of the project team and CEO of the company, Mr. Chen Haibing, encourages everyone: "The key to becoming a leading enterprise in China's electromagnetic wire industry is to form a technological advantage and an absolute competitive advantage. The technical requirements that are unheard before, which is our breakthrough opportunity. It is a good opportunity to turn the impossible into reality, not to mention this is a project where the country needs most and fills domestic gaps. If we don’t do it, who else can?  We must not only accept the tender, but finish it well!”  Therefore, Gold Cup Electric team has undertaken this "impossible" task. After more than 5 months of hard work day and night, one of the two ultra-high-temperature nuclear power special electromagnetic wires has completed the development. After testing by the national authority, the product performance fully meets the requirements of nuclear power projects, filling the domestic gap, the second The electromagnetic wire with higher temperature resistance level has completed the technological breakthrough and is ready to be submitted for inspection. The team members laughed, "We really gnawed this hard bone."


This is an aspiring, responsible and respected team.

Gold Cup Electric's "high-end special electromagnetic wire R&D project team " is not only responsible for the scientific research of the company's "technology leadership, innovation-driven" and to build the vision of China's electromagnetic wire leading enterprise, but also to break the international technical blockade and monopoly, Seize the commanding heights of technology, lead the development of industries and revitalize the national economy. They achieved it, and they did it well.

Proud success and achievements are not the end of this team. They are still fighting on the road of electromagnetic wire industry reform and development. A large number of process technologies that may overturn traditional electromagnetic wire production, such as enameled powder coating, are continuing. In the near future, in Gold Cup Electric  will emerge more young, excellent, and expert scientific research talents, and continue to make contribution to  scientific research and enterprise development and national revitalization!



Figure 1: A group photo of the Gold Cup Electric's "High-end Special Electromagnetic Wire R&D Project Team"

Figure 2: Secretary of the CPC Xiangtan Municipal Committee Cao Jiongfang investigates UHV projects

Figure 3: Xiangtan Mayor Zhang Yingchun visited the company to investigate the progress of new energy projects

Figure 4: Experts from internationally renowned EV/HEV manufacturer conduct a two-party audit


Correspondent: Wang Shuang, Zhao Fengjing, Editor in charge: Yang Dawei